Coating

Coating Solutions

LFBGroup Coating’s integrated pipe and coating facility offers customers transportation benefits by reducing costs, saving time, and minimizing the risk of pipe damage. This is because there is no need to transfer pipes to a non-integrated coating facility.

To assist our clients, LFBGroup offers just-in-time coating and delivers finished products. This integrated approach not only reduces risks for our clients but also saves time and cuts costs.

As customer requirements vary, LFBGroup upholds internal material specifications that exceed both industry and customer standards.

The primary purpose of internal coating is to improve flow by smoothing the internal pipe surface and to protect it from corrosion, resulting in a clean internal surface for pipes.

Powder/Liquid Epoxy

Outside Diameters : 168 mm.(6.625”) to 1,524 mm.(60”)
Pipe Length : 9.5 m. (31.7’) to 12.2 m. (42.3’)
Operating Temperatures : -40°C (-40°F) to 85°C (185°F)

Coating Process

Compliance

  • API RP5L2
  • BGC/PC/CMI
  • BGC/PS/CM2
  • NACE RP 0181
  • ISO 9001:2008

The main purpose of internal coating is to enhance flow by smoothing the internal surface of pipes, protect it from corrosion, and provide a clean internal surface for pipes.

  • FBE : Fusion Bonded Epoxy

FBE is a plant powder coating developed for use in oil and gas pipelines that require superior coating bond, chemical resistance, soil stress protection, and cathodic disbondment protection.

Outside Diameters : 168 mm.(6.625”) to 1,524 mm.(60”)
Pipe Length : 9.5 m. (31.7’) to 12.2 m. (40.6’)
Operating Temperatures : -40°C (-40°F) to 85°C (185°F)

Coating Process

Compliance

  • CSA/CAN Z245.20
  • GAZ de France R 09
  • NF A 49 706
  • AWWA C213
  • GBE/CW 6
  • ISO 10080
  • AS3862:2002
  • NACE RP 0394
  • ISO 9001:2008
  • PE : Polyethylene

PE is a multilayer coating system that includes a layer of fusion bonded epoxy, a copolymer adhesive, and an outer layer of polyethylene, providing a robust and durable coating solution for pipes.

Outside Diameters : 168 mm.(6.625”) to 1,524 mm.(60”)
Pipe Length : 9.5 m. (31.7’) to 12.2 m. (40.6’)
Operating Temperatures : -40°C (-40°F) to 85°C (185°F)

Coating Process

Compliance

  • CAN/CSA Z245.21
  • AS 1518
  • DIN 30670
  • ISO 9001:2008
  • PP : Polypropylene

PP is a multilayer coating system that comprises a layer of fusion bonded epoxy, a copolymer adhesive, and an outer layer of polypropylene, providing the strongest and most durable coating solution available for pipes.

Outside Diameters : 168 mm.(6.625”) to 1,524 mm.(60”)
Pipe Length : 9.5 m. (31.7’) to 12.2 m. (40.6’)
Operating Temperatures : -40°C (-40°F) to 110°C (230°F)

Coating Process

Compliance

  • CAN/CSA Z245.21
  • DIN 30678
  • ISO 9001:2008
  • DIN 30670
  • NF A49-711
  • TSA : Thermal Spray Aluminum

We offer specialized coating systems, such as the “Thermal Spray Aluminum (TSA) coating” tailored to meet the precise needs of our customers’ specific projects worldwide.

Coating Process

Testing